Home
Back

Price list for: Aurangabad Project-2

Effective From: 16 Oct. 2026 to 31 Mar. 2027

Office: 1st Floor, Sai Complex, M.G. Road, Opp. H.P. Petrol Pump, Aurangabad, Bihar

Site: Patna Road, Behaind B.L. Indo Public School, Aurangabad

Call: 9386256118 / 9386256119

Mail: aurangabad@vastuvihar.org

Price List of Bungalow

Model BungalowCarpet AreaB.U.ALand AreaDeluxe (₹)Luxury (₹)
YAMUNA 5 BHK16802200160057,00,00062,00,000
KAVERI 4 BHK10601400100040,50,00043,00,000
JAYANTI 3 BHK940130090037,00,00040,00,000
SIMPLEX 2 BHK (G+1)6301550100038,00,00040,00,000
GODAWARI 3 BHK660900100031,00,00033,00,000

Price List of Flats

Model FlatCarpet AreaB.U.AModelPrice (₹)
GANGA 1st FL41552518,00,000
GANGA 2nd FL41552517,50,000
GANGA 3rd FL41552517,00,000

Model Shop

Model ShopBuilt up Area (Sq. Ft.)Deluxe (₹)
Ground Floor1586,00,000
Ground Floor1305,00,000

Specification of Shop

ParticularsDeluxe
StuctureFrame Structure
Flooring InternalTiles (2'x2')
WallP.O.P
DoorSteel Shutter
Electricity FittingStandard ISI (1 Light, 1 A.C Point & 1 Fan Point)

Specification

ParticularDeluxeLuxury
StructureR.C.C FrameR.C.C Frame
Wall5" Brick Work5" Brick Work
Flooring24"x24" Tiles24"x48" Tiles
Wall InteriorWall PuttyWall Putty With Primer
Wall ExteriorWall Texture Front OnlyWall Texture All Side Outer Wall
Bathroom TilesTiles upto 5'Tiles upto 7'
Kitchen Wall Tiles2' Height7' Height
Kitchen TopBlack Granite with Half MouldBlack & Red Mix Granite with Full Molding
CP FittingNormalHindware
Hall BasinBasin OnlyPedstal Basin (Hindware)
Door FrameRed Stone FrameGranite Stone Frame
Door SutterFlush DoorFlush Door with Laminate
WindowsAluminumUPVC (2-Track)
Stair RailingS.S Railing (202)S.S Railing (304)
Stair TopGranite with TilesGranite with Full Molding
No. of AC Point1-BedroomAll Bedroom
Electric FitttingModular (Great-White)Modular Gray (Great-White)
Inverter PointNAYes
Roof TopNAHeavy Duty Tile (1'x1')
Parking AreaI.P.SParking Tiles (1'X1')
The unit will be handed over as per the approved specifications and No modifications or construction work will be allowed before project handover.